SO, here we go again.
Parts to go on order this week:
Hallman Pro Boost Controller
and maybe an 02A heavy duty clutch. 6 puck sprung.
Once some room opens up in the garage and or we get into our shop, ill start tear down. got some little things to repair along the way some oil seals and what not. Got to roll the fenders, i want to do a TDI fifth in whatever trans i can get, with these little wheels i can use all the help i can get on the highway.
the work that has to be done isnt a whole lot.
list of things to be crossed off:
1. Remove engine trans, break down/clean
2. strip engine bay to bare metal/ stitch weld everything i can.
3. clean and paint 02A transmission (yet to own)
4. re-shave engine bay, with weld in trays smooth strut towers.
5. fabricate drivers side and rear transmission mount.
6. notch the frame rails, so the axles dont come into contact anymore.
7. re-seam seal the inner fenders and inside the fenders (it hurts to hear rocks and pea gravel flying around in there)
8. re-wire the standalone and engine bay (third time

)
9. redo the entire cooling system, and if $ permits, all braided stainless fuel system and aftermarket FPR.
10. redo the brake lines i got the order wrong on the cylinder

and the car pulls/ brakes un-evenly.
12. repaint engine bay and install trim. Add some seam sealer to the rear and....................
11. finally get the pig to Dyno-Jet for some load mapping and numbers!
stay tuned